If you’d like to provide feedback on the ESO Data Portal, please contact us at box.OpenData.ESO@nationalgrideso.com

Datasets

5 datasets found

  • Fast Reserve Market Information


    Fast Reserve provides the rapid and reliable delivery of active power through an increased output from generation or a reduction in consumption from demand sources, following receipt of an electronic...

  • Super Stable Export Limit Contract Enactment


    Super Stable Export Limit (SEL) is utilised to directly decrease the sum of the minimum MW level or SEL of generators synchronized to the system by lowering the minimum generating level at a generator...

  • Short Term Operating Reserve (STOR) Post Tender Reports


    If demand ends up being greater than forecast, or there is unforeseen generation unavailability, extra sources of power may be needed to manage the system. One form of reserve that is used to manage...

  • Short Term Operating Reserve (STOR) Market Information


    If demand ends up being greater than forecast, or there is unforeseen generation unavailability, extra sources of power may be needed to manage the system. One form of reserve that is used to manage...

  • Firm Fast Reserve Post Tender Reports


    Fast Reserve provides the rapid and reliable delivery of active power through an increased output from generation or a reduction in consumption from demand sources, following receipt of an electronic...