If you’d like to provide feedback on the ESO Data Portal, please contact us at box.OpenData.ESO@nationalgrideso.com

Datasets

69 datasets found

  • Demand Data Update


    This publication is similar to "Historic Demand Data" dataset but updated on a daily basis with approximately ten days lag in receiving settlement data . In the dataset a embedded forecast for the...

  • Day Ahead Wind Forecast


    The dataset contains national wind forecast over a day ahead timescale to assist the industry to make efficient decisions in balancing their supply and demand positions. ...

  • Historic Generation Mix & Carbon Intensity


    This dataset contains data from the 1st of Jan 2009. It has seasonal decomposition applied to correct missing or irregular data points. The carbon intensity of electricity is a measure of how much...

  • Interconnector Register


    A list of interconnector projects that hold connection contacts with us. These include active interconnectors and future interconnector projects. ...

  • Embedded Register


    A list of connected or contracted to connect embedded generation projects in Scotland. ...

  • Transmission Entry Capacity (TEC) Register


    A list of projects that hold contracts for Transmission Entry Capacity (TEC) with us. These include existing and future connection projects and projects that can be directly linked to the National...

  • Day Ahead Constraint Flows and Limits


    A snapshot of the limits and flows at relevant boundaries at day ahead stage. These flow values are true for when the measurement was taken and will not reflect any changes in the flows following the...

  • Interconnector Requirement and Auction Summary Data


    National Grid ESO (NGESO) trades on interconnectors to adjust the flow of electricity into or out of Great Britain to help manage system issues such as Rate Of Change Of Frequency (ROCOF), thermal...

  • Balancing Services Charging Report (BCR)


    The Balancing Services Charging Report (BCR) provides a breakdown of the Balancing Services Use of System (BSUoS) charge. There is a BCR for each run type we calculate a BSUoS charge for - Interim...

  • Current Balancing Services Use of System (BSUoS) Charges


    There is a file for each run type we calculate a BSUoS charge for - Interim Initial (II), Settlement Final (SF) and Reconciliation Final (RF). These are updated daily with the actual Half Hourly BSUoS...