  • Index Linked Contracted Energy Volume


    Index Linked Contract can be used by National Grid ESO to meet the [voltage requirement](https://www.nationalgrideso.com/transmission-constraint-management?market-information "voltage"). The contract...

  • Super Stable Export Limit Contract Enactment


    Super Stable Export Limit (SEL) is utilised to directly decrease the sum of the minimum MW level or SEL of generators synchronized to the system by lowering the minimum generating level at a generator...

  • Upcoming Trades


    In order to meet forecast Electricity System Operator (ESO) balancing requirements at minimum cost, ESO trades energy-related products. This dataset displays all upcoming electricity trades due to be...

  • Non-BM Ancillary Service Dispatch Platform (ASDP) Instructions


    The Electricity System Operator (ESO) publishes Non-BM Instruction data from its Ancillary Services Dispatch (ASDP) System. This is published near real time publishing data from ASDP every 30 seconds....

  • Balancing Services Contract Enactment


    National Grid ESO procures [balancing service contracts](https://www.nationalgrideso.com/balancing-services/list-all-balancing-services) to balance demand and supply and to ensure the security and...

  • Historic Generation Mix & Carbon Intensity


    This dataset contains data from the 1st of Jan 2009. It has seasonal decomposition applied to correct missing or irregular data points. The carbon intensity of electricity is a measure of how much...

  • Weekly Operational Planning Margin Requirement (OPMR)


    When assessing and publishing generation availability information against system requirements, Electricity System Operator (ESO) includes an Operational Planning Margin Requirement (OPMR) above demand...

  • Daily Operational Planning Margin Requirement (OPMR)


    When assessing and publishing generation availability information against system requirements, Electricity System Operator (ESO) includes an Operational Planning Margin Requirement (OPMR) above the...

  • Weekly Wind Availability


    This publication displays the Electricity System Operator’s (ESO) wind generator availability in megawatt (MW) at a generator level at a weekly resolution for 2-52 weeks ahead. ...

  • Daily Wind Availability


    This publication displays the Electricity System Operator’s (ESO) wind generator availability in megawatts (MW) at a daily resolution for 2-14 days ahead. ...